Blue Line
The Blue Line is the third bus rapid-transit route identified in the Marion County Transit Plan, after the Red Line, which entered revenue service in September 2019, and the Purple Line, which later entered service between downtown and Lawrence.[2][3][4] Official IndyGo Blue Line materials describe a 24-mile route with 30 stations, spaced one-half mile to one mile apart, following current Route 8 along Washington Street from Cumberland west to the airport.[1] Design was complete in September 2024; groundbreaking was in February 2025; construction was scheduled to begin in the second quarter of 2025; and the line is scheduled to open in late 2028.[1] An earlier projects page, written before those later dates, said design for the Blue Line was approaching 90 percent completion.[2] As of the official project page fetched for this article, the Blue Line was not yet in passenger service.[1]
Route and schedule
The official project page lists 30 stations, a distance of 24 miles, and a late-2028 opening.[1] The same page lists planned service hours of Monday through Friday 5 a.m. to 1 a.m., Saturday 6 a.m. to 1 a.m., and Sunday 7 a.m. to 10 p.m.; those hours are planned, not a record of current service.[1] An interactive map on the official page shows 100 percent design, including proposed station locations and lane configurations.[1] Individual proposed station names from that map are not transcribed here.[1]
What IndyGo says riders will have
IndyGo says riders will benefit from level boarding, fare collection through MyKey+, real-time arrival signage, frequent service, and covered stations for weather protection.[1] Those are official project descriptions of planned features, not a review of service already in operation.[1] The page also describes the line as the next stage of the BRT system, providing increased frequency and reliability relative to ordinary local-bus service, and as a large infrastructure project as well as a transit project.[1]
Funding context
Local funding for the Marion County Transit Plan followed the November 8, 2016, referendum (59.4 percent of Marion County voters in favor of a tax of up to 0.25 percent) and the January 9, 2017, City-County Council action on Proposal 3.[2] The 2014 state law that authorized a referendum also required IndyGo to raise privately 10 percent of its operating costs.[3] A total project-cost figure for the Blue Line is not clearly stated as a single number on the fetched official Blue Line page and is not invented here.[1]
Related lines and the airport
The Red Line is 13 miles, from Broad Ripple through downtown to the University of Indianapolis.[6][2] The Purple Line is 15.2 miles, with 31 stations, from downtown to Lawrence, at a launch-reported cost of $188 million including $81 million in federal funds.[4] Indianapolis International Airport, the Blue Line's planned western end, occupies a west-side site purchased in 1929; the current midfield Weir Cook Terminal opened on November 12, 2008.[7][1]
Vehicles and planned stations
Unlike the fully electric 60-foot articulated buses IndyGo describes on the Red Line, the official Blue Line page describes 60-foot articulated, clean-diesel vehicles with doors opening on either side and with onboard bicycle storage instead of front-of-bus racks, together with level boarding platforms.[1][6] Planned rapid-transit stations, according to the same page, feature in-median locations; digital screens displaying real-time arrival information; level station access in accordance with the Americans with Disabilities Act; flush, step-free, bus-height boarding platforms; well-lit boarding areas, security cameras, and blue-light emergency phones; and wind screens and drip-free roof eaves.[1] Those are official descriptions of the design, written before passenger service is scheduled to begin in late 2028.[1]
On the east side, Washington Street through Irvington was designated as part of U.S. 40 in 1926, and by 1940 the neighborhood had a dozen filling stations along that street.[5] Downtown, the Wholesale District's encyclopedia article notes the district's proximity to Washington Street retailers as well as to the railroads.[8] The planned Blue Line would travel that same east–west street to the airport, whose present site the city bought in 1929 on South High School Road.[1][7]
Common questions
Is the Blue Line running yet?
Not as of the official IndyGo project page fetched for this article. The line is scheduled to open in late 2028.[1]
Where will it go?
Official materials describe a 24-mile route with 30 stations, following Route 8 along Washington Street from Cumberland west to Indianapolis International Airport.[1]
When did construction start?
Official dates are design complete in September 2024, groundbreaking in February 2025, and construction beginning in the second quarter of 2025.[1]
Related pages
References
All sources retrieved November 2026, unless a source is dated in the text.
- ^ a b c d e f g h i j k l m n o p q r s t u v w x y z "Blue Line". IndyGo. Retrieved November 2026.
- ^ a b c d "Projects". IndyGo. Retrieved November 2026.
- ^ a b "IndyGo". Encyclopedia of Indianapolis. Retrieved November 2026.
- ^ a b "IndyGo Cuts the Ribbon to Celebrate the Official Grand Opening of the Purple Line". IndyGo. Retrieved November 2026.
- ^ a b "Irvington". Encyclopedia of Indianapolis. Retrieved November 2026.
- ^ a b "Red Line". IndyGo. Retrieved November 2026.
- ^ a b "Indianapolis International Airport". Encyclopedia of Indianapolis. Retrieved November 2026.
- ^ "Wholesale District". Encyclopedia of Indianapolis. Retrieved November 2026.