Red Line
The Red Line is IndyGo's first bus rapid-transit (BRT) route and the first line built under the Marion County Transit Plan, which also identified the later Purple and Blue lines.[3][1] Construction began in 2018, and revenue service began in September 2019.[1] A short Encyclopedia of Indianapolis note records that the line had been under construction since 2018 and that service on Indianapolis's first bus rapid-transit system began.[4] The official IndyGo Red Line page describes the route as 13 miles long.[2] The official projects page says the Red Line runs from Broad Ripple through downtown Indianapolis to the University of Indianapolis, connecting neighborhoods, major employers, and cultural institutions.[3] The encyclopedia says the Red Line serves the central portion of Marion County, starting in a northern neighborhood and traveling south (those place-names are not clearly recoverable in the fetched encyclopedia text; the official IndyGo page supplies Broad Ripple and the University of Indianapolis).[1][3]
Planning and opening
After the 2016 referendum and the 2017 local tax measure, construction on the first phase—the Red Line—began in 2018.[1] Revenue service began in September 2019.[1] The line is the first of three BRT corridors in the Marion County Transit Plan.[3] Weekend service on the broader IndyGo network was added in 2018 as the agency moved toward offering every route every day of the week.[3]
Route and stations
Official IndyGo materials give the Red Line a length of 13 miles and describe a corridor that IndyGo calls the densest corridor of both residents and employers within Marion County.[2] The projects page's route description—from Broad Ripple through downtown to the University of Indianapolis—is the basis for the endpoints stated on this page.[3] Fountain Square and Broad Ripple encyclopedia articles also note later connections via the Red Line.[5][6] Station features named by IndyGo include level or multi-door boarding on vehicles developed for rapid-transit operation, with doors opening on either side of the bus, and covered or in-median stations with ticket vending.[2]
Vehicles and later network
IndyGo's Red Line page describes vehicles that operate without emitting exhaust and states a goal of running BRT with a zero-emission fleet.[2] The Purple Line later entered service as a 15.2-mile route with 31 stations from downtown to Lawrence, and the Blue Line is planned as a 24-mile route on Washington Street from Cumberland to the airport, scheduled to open in late 2028.[7][8] This page does not compare the lines as a rider guide.[3]
Ridership context
Systemwide, the encyclopedia reports a sharp ridership decline during the COVID-19 pandemic, from over 9.2 million passengers in 2019 to around 4.8 million in 2020, a 51.8 percent decline, after which IndyGo eliminated fares for a time and cut some services.[1] A separate 2019 figure of 8.5 million appears in the same encyclopedia article; both figures are reported on the IndyGo page rather than resolved here.[1] By 2020, IndyGo operated 31 fixed routes using 212 buses and about 7,000 stops, plus Open Door paratransit.[1]
Vehicles, hours, and IndyGo's corridor figures
IndyGo describes the Red Line buses as 60-foot, articulated, fully electric vehicles with doors opening on either side and with onboard bicycle storage instead of front-of-bus bike racks.[2] Official service hours given on the Red Line page are Monday through Friday 5 a.m. to 1 a.m., Saturday 6 a.m. to 1 a.m., and Sunday 7 a.m. to 10 p.m., with service every 15–20 minutes in each of those windows.[2] IndyGo states that the line rolls within a quarter mile of more than 50,000 residents and nearly 150,000 jobs, which it describes as one in every four jobs in Marion County, and that before the Red Line the corridor was served by the agency's most heavily traveled local bus routes, representing only 1 percent of IndyGo's service area but 15 percent of all IndyGo boardings.[2] The same official page names IU Health Methodist, Ivy Tech Community College, IU Indianapolis (then commonly called IUPUI), and the University of Indianapolis among institutions along the corridor.[2] Those corridor figures are IndyGo's statements, not independently counted on this page.[2]
Common questions
When did the Red Line start service?
Revenue service began in September 2019, after construction started in 2018.[1]
How long is the Red Line?
The official IndyGo Red Line page describes the route as 13 miles long, from Broad Ripple through downtown to the University of Indianapolis.[2][3]
Was it the first bus rapid-transit line in Indianapolis?
Yes. The encyclopedia and IndyGo both describe the Red Line as the city's first BRT system, with the Purple and Blue lines identified later in the same transit plan.[1][3]
Related pages
References
All sources retrieved November 2026, unless a source is dated in the text.
- ^ a b c d e f g h i j k l m n o "IndyGo". Encyclopedia of Indianapolis. Retrieved November 2026.
- ^ a b c d e f g h i j k l m "Red Line". IndyGo. Retrieved November 2026.
- ^ a b c d e f g h i j k "Projects". IndyGo. Retrieved November 2026.
- ^ "Red Line". Encyclopedia of Indianapolis. Retrieved November 2026.
- ^ "Fountain Square". Encyclopedia of Indianapolis. Retrieved November 2026.
- ^ "Broad Ripple". Encyclopedia of Indianapolis. Retrieved November 2026.
- ^ "IndyGo Cuts the Ribbon to Celebrate the Official Grand Opening of the Purple Line". IndyGo. Retrieved November 2026.
- ^ "Blue Line". IndyGo. Retrieved November 2026.